FCE_010008
5 of 11
The S332D pump structure at the headwaters of Taylor Slough, along the TS/Ph (Southern Everglades) transect of the FCE LTER. There are 2 such pump structures that actively move canal water into the Taylor Slough drainage.
The S332D pump structure at the headwaters of Taylor Slough, along the TS/Ph (Southern Everglades) transect of the FCE LTER. There are 2 such pump structures that actively move canal water into the Taylor Slough drainage.